Approval for the scheme to progress through
Activity 5 (Full Business Case plus finalised costs)
Decision Maker: Chief Executive
Decision published: 02/08/2021
Effective from: 10/08/2021
Decision:
To approve that
· The Corridor Improvement Programme Calderdale A646-A6033 Corridor scheme proceeds through decision point 5 and work commences on activity 6 (Delivery).
· Approval to the total Combined Authority contribution of £3.988 million, to be funded through the West Yorkshire plus Transport Fund, is given. The total scheme value is £4.313 million, with a £0.325 million match contribution from Calderdale Council.
· The Combined Authority enters into an addendum to the existing funding agreement with Calderdale Council for expenditure of up to £3.988 million from the West Yorkshire plus Transport Fund.
Lead officer: James Bennett
Approval for the scheme to progress through
Activity 5 (Full Business Case plus finalised costs)
Decision Maker: Chief Executive
Decision published: 02/08/2021
Effective from: 10/08/2021
Decision:
To approve that
· The Corridor Improvement Programme A58/A672 scheme proceeds through decision point 5 and work commences on activity 6 (Delivery).
· Approval to the total scheme cost of £4.947 million, to be funded through the West Yorkshire plus Transport Fund, is given.
· The Combined Authority enters into an addendum to the existing funding agreement with Calderdale Council for total expenditure up to £4.947 million from the West Yorkshire plus Transport Fund.
Lead officer: James Bennett
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved:
(a) That the
Combined Authority notes the Government’s proposals for the
City Region Sustainable Transport Settlement and agrees to submit a
CRSTS proposal for the 5-year period 2022/23 to 2026/27 to the
Department for Transport, which is aligned to accelerating the
delivery of the West Yorkshire Connectivity Infrastructure
Plan.
(b) That the
Combined Authority agrees to delegate the decision on the detail of
the final City Region Sustainable Transport Settlement submission
to the Managing Director in consultation with the Mayor and Chair
of Transport Committee.
(c) That the
Combined Authority notes the Government’s proposals for
Active Travel Fund Local Authority Capital Funding for 2021/22 and
agrees to submit a bid proposal and Expressions of Interests to the
Department for Transport.
(d) That the Combined Authority agrees to delegate the decision on the detail of the final bid proposal and Expression of Interests to the DfT Active Travel Fund Local Authority Capital Fund for 2021/22 to the Managing Director in consultation with the Mayor and Chair of the Transport Committee’s Active Travel Members Working Group.
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved:
(a) That the Combined
Authority indicatively approves funding from the Single Investment
Fund to enable progress to be made in key priority areas, with full
approval to spend being granted once the project has progressed
through the assurance process in line with the Combined
Authority’s Assurance Process. The indicative funding
requested is:
·
£500k to support scheme development relating
to business support.
·
£400k over three years to enable the
recruitment of the Inclusivity Champion and further progress a
pipeline of inclusive growth work.
(b) That the Combined
Authority notes that £190k from the £500k of SIF
funding which was previously provisionally allocated to support
scheme development relating to culture and creative industries and
lead a creative new deal, is to be used to fund the Beyond
Bronte’s programme, subject to Assurance Framework
approvals.
(c) That the Combined Authority delegates to the Finance, Resources and Corporate Committee, the approval for the programmes set out in the report to pass through Decision Point 2, totalling no more than £0.9m of funding from the Single Investment Fund.
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved:
(a) That
the Combined Authority notes and endorses the approach to delivery
of the Mayor’s housing pledge working closely with Partners,
including Districts through their Directors of
Development.
(b) That following a recommendation from the Investment Committee, the Combined Authority approves:
(i) That
the Housing Revenue Fund programme proceeds through
decision point 2 (strategic outline case) and decision point 4
(full business case) with Approval to Proceed to activity 5
(delivery).
(ii) That approval to the
remainder of the Combined Authority’s contribution of
£2.95 million, funded from the West Yorkshire Devolution
Deal, is given. The total scheme value if £3.2
million.
(iii) That allocation of the £2.95 million of funding for the
individual work packages is delegated to the Managing
Director.
(iv) That future approvals are made in accordance with the assurance pathway and approval route outlined in appendix 1 of the submitted report.
Approval for the scheme to progress through
Activity 5 (Full Business Case with finalised costs) and work
commence on Activity 6 (Delivery).
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved: That in respect to Transforming Cities Fund
Halifax Bus Station, the Combined Authority approves:
(i) That the
Transforming Cities Fund Halifax Bus Station scheme proceeds
through decision point 5 and work commences on activity 6
(Delivery).
(ii) That approval to total
scheme costs of £17.700 million is given, of which the
Combined Authority to contribute £17.295 million from the
Transforming Cities Fund and £0.405 million from the West
Yorkshire plus Transport Fund.
(iii) That the Combined
Authority enters into a Memorandum of Understanding Agreement with
Calderdale Council for expenditure up to £50,000 from the
Transforming Cities Fund.
(iv) That future approvals are made in accordance with the assurance pathway and approval route outlined in the submitted report. This will be subject to the scheme remaining within the tolerances outlined in the report.
Lead officer: Mark Auger
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved:
(a) That the Place Narrative
be approved and its positioning as part of the Strategic Economic
Framework be endorsed.
(b) That approval of future updates of the Place Narrative be delegated to the Place, Regeneration and Housing Committee.
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved:
(a) That the Combined
Authority notes the work undertaken so far on the Brownfield
Housing Fund Programme.
(b) That the Combined
Authority sequencing of Waves and associated projects in Exempt
Appendix 1 be endorsed.
(c) That in light of the
proposed changes to Committees, future project approvals are made
in accordance with the assurance pathway and approval route
outlined and approved by the Combined Authority in September 2020,
including at the next decision point through delegation to the
Place, Regeneration and Housing Committee and at decision point 5
through a delegation to the Combined Authority’s Managing
Director following a recommendation by the Combined
Authority’s Programme Appraisal Team.
(d) That to ensure the
programme progresses at pace, to delegate to the Director of
Delivery, in consultation with the Portfolio Holder for Place,
Regeneration and Housing:
(i) The review and
transfer of projects between the project prioritisation
‘Waves’ detailed in Exempt Appendix 1.
(ii) The
acceptance of new projects on to the programme.
(iii) The transfer of projects which place greater risk on the programme back to the Strategic Housing pipeline for consideration as part of future investment programmes.
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved:
(a) That in respect of the
Clifton (Calderdale) Enterprise Zone Business Rates Receipt, the
Combined Authority approves that, subject to the conditions in the
submitted report, Calderdale Council retains future business rates
income generated from the Clifton Enterprise Zone (up to March
2042).
(b) That in respect of the British Library for the North (Temple Works), the Combined Authority approves:
(i) That the British
Library for the North (Temple Works) scheme proceeds through
decision point 2 (strategic outline case) and work commences on
activity 3 (outline business case).
(ii) That an indicative
approval of £25 million (to be funded through the Combined
Authority’s devolution deal) is given. The total forecast
scheme value is £69.810 million.
(iii) That approval of
£5.35 million development costs to progress the scheme to
decision point 3 (outline business case) be given.
(iv)
That the Combined Authority enters into a funding agreement with
Leeds City Council for expenditure of up to £5 million from
the Combined Authority’s devolution deal.
(v) That future approvals are
made in accordance with the assurance pathway and approval route
outlined in the submitted report. This will be subject to the
scheme remaining within the tolerances outlined in the
report.
(c) That in respect of the TCF
Network Navigation, the Combined Authority approves:
(i) That the TCF Network
Navigation project proceeds through decision point 3 (outline
business case) and work commences on activity 4 (full business
case)
(ii) That an indicative
approval to the total project value of £15.500 million,
comprising of £15.200 million from the Transforming Cities
Fund, and £0.300 million from Local Transport Plan Integrated
Transport Block, is given.
(iii) That development costs of
£0.200 million are approved to progress the scheme to
decision point 4 (full business case) taking the total scheme
approval to £0.360 million.
(iv)
That future approvals are made in accordance with the assurance
pathway and approval route outlined in the submitted report. This
will be subject to the scheme remaining within the tolerances
outlined in the report.
(d) That in respect of the
CityConnect Phase 3 Canals - Leeds
Liverpool Shipley, the Combined Authority approves, subject to the
conditions set by PAT stated in the submitted report:
(i) That the
CityConnect Phase 3 Canals - Leeds
Liverpool Shipley scheme proceeds through decision point 4 (full
business case) and work commences on activity 5
(Delivery).
(ii) That approval to the
Combined Authority’s contribution of £1.981 million
which will be funded from West Yorkshire plus Transport Fund
(£1.057 million), Getting Building Fund (£0.500
million) and £0.424 million yet to be secured is given. The
total scheme value is £1.981 million.
(iii) That the Combined
Authority enters into an addendum to the existing funding agreement
with the Canal and River Trust for expenditure of up to
£1.981 million.
(iv)
That future approvals are made in accordance with the assurance
pathway and approval route outlined in the submitted report. This
will be subject to the scheme remaining within the tolerances
outlined in the report.
(e) That in respect of the CityConnect Phase 3 Canals - Huddersfield Narrow Canal (HNC) Phase 2, the Combined Authority approves, subject to the conditions set by PAT stated in the submitted report:
(i) That the
CityConnect Phase 3 Canals –
Huddersfield Narrow Canal Phase 2 scheme proceeds through Decision
Point 4 (full business case) and work commences on Activity 5
(Delivery).
(ii) That approval to the
Combined Authority’s contribution of £1.371 million
(which will be funded through £0.643 million from the West
Yorkshire plus Transport Fund and £0.728 million from the
Active Travel Fund) is given. The total scheme value is
£1.371 million.
(iii) That the Combined
Authority enters into an addendum to the existing funding agreement
with the Canal and River Trust for expenditure of up to
£0.643 million from the West Yorkshire plus Transport
Fund.
(iv)
That the Combined Authority enters into an addendum to the existing
funding letter with Kirklees Council for expenditure of up to
£0.728 million from the Active Travel Fund.
(v) That future approvals are
made in accordance with the assurance pathway and approval route
outlined in the submitted report. This will be subject to the
scheme remaining within the tolerances outlined in the
report.
(f) That in respect to
Transforming Cities Fund Halifax Bus Station, the Combined
Authority approves:
(i) That the
Transforming Cities Fund Halifax Bus Station scheme proceeds
through decision point 5 and work commences on activity 6
(Delivery).
(ii) That approval to total
scheme costs of £17.700 million is given, of which the
Combined Authority to contribute £17.295 million from the
Transforming Cities Fund and £0.405 million from the West
Yorkshire plus Transport Fund.
(iii) That the Combined
Authority enters into a Memorandum of Understanding Agreement with
Calderdale Council for expenditure up to £50,000 from the
Transforming Cities Fund.
(iv) That future approvals are made in accordance with the assurance pathway and approval route outlined in the submitted report. This will be subject to the scheme remaining within the tolerances outlined in the report.
The Combined Authority receives 100% of the
Business Rates generated within the EZ sites for a period of 25
years from date of designation (up to March 2042 for phase 2 sites,
which includes Clifton). Calderdale Council have asked the Combined
Authority, as accountable body for the LEP, to consider the
passporting of future business rates from the Clifton site to the
Council to support prudential borrowing for capital required to
deliver the full scheme of enabling works.
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved: That in respect of the Clifton (Calderdale) Enterprise Zone Business Rates Receipt, the Combined Authority approves that, subject to the conditions in the submitted report, Calderdale Council retains future business rates income generated from the Clifton Enterprise Zone (up to March 2042).
Lead officer: Jess McNeill
Approval for the scheme to progress through
Activity 3 (Outline Business Case)
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved: That in respect of the TCF Network Navigation, the
Combined Authority approves:
(i) That the TCF Network
Navigation project proceeds through decision point 3 (outline
business case) and work commences on activity 4 (full business
case).
(ii) That an indicative
approval to the total project value of £15.500 million,
comprising of £15.200 million from the Transforming Cities
Fund, and £0.300 million from Local Transport Plan Integrated
Transport Block, is given.
(iii) That development costs of
£0.200 million are approved to progress the scheme to
decision point 4 (full business case) taking the total scheme
approval to £0.360 million.
(iv) That future approvals are made in accordance with the assurance pathway and approval route outlined in the submitted report. This will be subject to the scheme remaining within the tolerances outlined in the report.
Lead officer: Fiona Limb
Approval for the scheme to progress through
Activity 2 (Strategic Outline Case).
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved: That following a recommendation from the Investment Committee, the Combined Authority approves:
(i) That
the Housing Revenue Fund programme proceeds through
decision point 2 (strategic outline case) and decision point 4
(full business case) with Approval to Proceed to activity 5
(delivery).
(ii) That approval to the
remainder of the Combined Authority’s contribution of
£2.95 million, funded from the West Yorkshire Devolution
Deal, is given. The total scheme value if £3.2
million.
(iii) That allocation of the £2.95 million of funding for the
individual work packages is delegated to the Managing
Director.
(iv) That future approvals are made in accordance with the assurance pathway and approval route outlined in appendix 1 of the submitted report.
Lead officer: Rebecca Greenwood
Approval for the scheme to progress through
Activity 5 (Full Business Case with finalised costs) and work
commence on Activity 6 (Delivery).
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved: That in respect of the CityConnect Phase 3 Canals - Huddersfield Narrow Canal (HNC) Phase 2, the Combined Authority approves, subject to the conditions set by PAT stated in the submitted report:
(i) That the
CityConnect Phase 3 Canals –
Huddersfield Narrow Canal Phase 2 scheme proceeds through Decision
Point 4 (full business case) and work commences on Activity 5
(Delivery).
(ii) That approval
to the Combined Authority’s contribution of £1.371
million (which will be funded through £0.643 million from the
West Yorkshire plus Transport Fund and £0.728 million from
the Active Travel Fund) is given. The total scheme value is
£1.371 million.
(iii)
That the Combined Authority enters into an addendum to the existing
funding agreement with the Canal and River Trust for expenditure of
up to £0.643 million from the West Yorkshire plus Transport
Fund.
(iv) That
the Combined Authority enters into an addendum to the existing
funding letter with Kirklees Council for expenditure of up to
£0.728 million from the Active Travel Fund.
(v) That future approvals are made in accordance with the assurance pathway and approval route outlined in the submitted report. This will be subject to the scheme remaining within the tolerances outlined in the report.
Lead officer: Robert Griffiths
Approval for the scheme to progress through
Activity 5 (Full Business Case with Finalised Costs).
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved: That in respect of the CityConnect Phase 3 Canals - Leeds Liverpool
Shipley, the Combined Authority approves, subject to the conditions
set by PAT stated in the submitted report:
(i) That the
CityConnect Phase 3 Canals - Leeds
Liverpool Shipley scheme proceeds through decision point 4 (full
business case) and work commences on activity 5
(Delivery).
(ii) That approval to the
Combined Authority’s contribution of £1.981 million
which will be funded from West Yorkshire plus Transport Fund
(£1.057 million), Getting Building Fund (£0.500
million) and £0.424 million yet to be secured is given. The
total scheme value is £1.981 million.
(iii) That the Combined
Authority enters into an addendum to the existing funding agreement
with the Canal and River Trust for expenditure of up to
£1.981 million.
(iv) That future approvals are made in accordance with the assurance pathway and approval route outlined in the submitted report. This will be subject to the scheme remaining within the tolerances outlined in the report.
Lead officer: Robert Griffiths
Approval for the scheme to progress through
Activity 2 (Strategic Outline Case)
Decision Maker: West Yorkshire Combined Authority
Made at meeting: 29/07/2021 - West Yorkshire Combined Authority
Decision published: 29/07/2021
Effective from: 06/08/2021
Decision:
Resolved: That in respect of the British Library for the North (Temple Works), the Combined Authority approves:
(i) That the British
Library for the North (Temple Works) scheme proceeds through
decision point 2 (strategic outline case) and work commences on
activity 3 (outline business case).
(ii) That an indicative
approval of £25 million (to be funded through the Combined
Authority’s devolution deal) is given. The total forecast
scheme value is £69.810 million.
(iii) That approval of
£5.35 million development costs to progress the scheme to
decision point 3 (outline business case).
(iv)
That the Combined Authority enters into a funding agreement with
Leeds City Council for expenditure of up to £5 million from
the Combined Authority’s devolution deal.
(v) That future approvals are made in accordance with the assurance pathway and approval route outlined in the submitted report. This will be subject to the scheme remaining within the tolerances outlined in the report.
Lead officer: Elizabeth Courtney
To enable delivery to continue on LRF schemes
in Wakefield and Craven contributing to the completion of 74
housing units across the LRF programme.
Decision Maker: Chief Executive
Decision published: 21/07/2021
Effective from: 16/07/2021
Decision:
To approve that:
i. The change request to the Land Release Fund (LRF) programme is
approved. This confirms that the overall LRF programme cost is
£475,875.
ii. The delivery timeframe for Craven’s Airedale Avenue and
Wakefield’s Langthwaite Lane projects within the LRF
programme is extended to March 2022.
iii. The Combined Authority enters into a funding agreement with
Wakefield Council for expenditure of up to £19,375 from the
Land Release Fund.
iv. The Combined Authority extends the funding agreement with
Craven District Council for the Airedale Avenue site until the end
of March 2022.
Lead officer: Ben Still
To allocate delegated funding from Department for Education to support the new Lifetime Skills Guarantee to Grant providers route 1: Level 3 Adult Offer to the total value of £4,622,770 for delivery from 1 August 2021.
Decision Maker: Chief Executive
Decision published: 20/07/2021
Effective from: 30/07/2021
Decision:
To:
(i) approve the allocations for the Lifetime Skills Level 3 Guarantee allocations,
(ii) enter into contracts with the suppliers listed in the report submitted to the decision maker.
Lead officer: Catherine Lunn
To enable the completion of the schemes to
provide walking and cycling facility improvements at Dewsbury and
Huddersfield rail stations alongside improvements to walking and
cycling access routes to the stations.
Decision Maker: Chief Executive
Decision published: 19/07/2021
Effective from: 12/07/2021
Decision:
To approve that:
i.The change request to the TCF Kirklees Early Walking and Cycling
Gateways – Dewsbury Rail Station Access and Huddersfield
Better Connected Stations projects, to change the completion dates
and funding profile, is approved.
ii.The Combined Authority enters into an addendum to the existing
funding agreement with Kirklees Council for expenditure of up to
£1.735 million from the Transforming Cities Fund –
Tranche 1/Early Gateways for the Huddersfield Better Connected
Stations project.
iii.The Combined Authority enters into a funding agreement with
Kirklees Council for expenditure up to £0.160 million from
the Transforming Cities Fund – Tranche 1/Early Gateways for
the Dewsbury Rail Station Access project.
Lead officer: Ben Still