Agenda item

Capital Spending and Project Approvals

Decision:

(i)              In respect of the Project 7 – SIIF 012 – Advanced Manufacturing Company the Investment Committee recommended to the Combined Authority that they delegate authority to the Combined Authority’s Managing Director to approve, subject to the successful appraisal of the application by the Business Investment Panel (BIP) and Programme Appraisal Team (PAT).

(a)        The applicant’s full business case with finalised costs (decision point 5) and that work commences on activity 6 (delivery),

(b)        Approval for the Combined Authority’s contribution of £0.779 million is given from the Local Growth Fund.

(c)        The scheme’s Assurance Framework pathway and approvals.

(ii)             In respect of LTP: Transforming Travel Centres the Investment Committee approved:

(a)         That the Transforming Travel Centres scheme proceeds through decision point 2 (strategic outline case) and work commences on activity 5 (full business case with finalised costs).

(b)         That an indicative approval to the total project value of £1.000 million is given from the Local Transport Plan Integrated Transport Block Fund, with full approval to spend being granted once the scheme has progressed through the assurance process to decision point 5 (full business case with finalised costs). 

(c)        That development costs of £0.169 million are approved to progress the scheme to decision point 5 (full business case with finalised costs), taking the total approval to £0.270 million, from the Local Transport Plan Integrated Transport Block Fund. 

(d)         Future approvals are made in accordance with the assurance pathway and approval route outlined in this report subject to the scheme remaining within the tolerances outlined in this report.

(iii)           In respect of the A58 Corridor (Leeds) the Investment Committee recommended to the Combined Authority that:

(a)        The A58 Corridor scheme proceeds through decision point 3 (outline business case) and work commences on activity 4 (full business case).

(b)        That an indicative approval to the total project value of £9.530 millionis granted from the West Yorkshire plus Transport Fund, with full approval to spend being granted once the scheme has progressed through the assurance process to decision point 5 (full business case with finalised costs).

(c)        Development costs of £1.259 million from the West Yorkshire plus Transport Fund are approved to cover costs to date to progress the scheme to outline business case and in order to progress the scheme to decision point 4 (full business case with finalised costs) and 5 (full business case with finalised costs).

(d)        The Combined Authority enters into a funding agreement with Leeds City Council for up to £1.259 from the West Yorkshire plus Transport Fund.

(e)        Future approvals are made in accordance with the assurance pathway and approval route outlined in this report subject to the scheme remaining within the tolerances outlined in this report.

(iv)           In respect of the LTP ITB Rail Accessibility Package the Investment Committee approved that:

(a)        The LTP ITB Rail Accessibility Package proceeds through decision point 5 (full business case with finalised costs) and work commences on activity 6 (delivery).

(b)        Approval to £708,750 from the Local Transport Plan Integrated Transport Block 2019-22 is given. The total scheme value is £7.044 million.

(c)        The Combined Authority to enter into a grant funding agreement with Northern for expenditure of up to £176,250 from the LTP ITB 2019-22 fund, towards the Todmorden business case development and delivery costs.

(d)        The Combined Authority to enter into a funding agreement with Network Rail for expenditure of up to £0.180 million from the LTP ITB 2019-22 fund, towards the Menston business case development and delivery costs.

(e)        The Combined Authority to enter into a grant funding agreement with Northern for expenditure of up to £352,500 from the LTP ITB 2019-22 fund, towards the Pontefract Monkhill business case development and delivery costs.

(f)          Future approvals are made in accordance with the assurance pathway and approval route outlined in this report, subject to the package remaining within the tolerances outlined in this report.

(v)            In respect of Wakefield Warm Homes the Investment Committee approved that:

(a)        The Wakefield Warm Homes scheme proceeds through decision point 5 (full business case with finalised costs) and work comments on activity 6 (delivery)

(b)        Approval to £0.661 million from the Getting Building Fund is given. The total scheme value is £0.961 million.

(c)        The Combined Authority to enter into a funding agreement with Wakefield Council for expenditure of up to £0.661 million from the Getting Building Fund.

(d)        Future approvals are made in accordance with the assurance pathway and approval route outlined in this report subject to the scheme remaining within the tolerances outlined in this report.

(vi)           In respect of the Holbeck Phase 2 Victorian Terrace Retrofit the Investment Committee approves that:  

(a)        The GBF Holbeck Phase 2 scheme proceeds through decision point 5 (full business case with finalised costs) and work commences on activity 6 (delivery).  

(b)        Approval for the Combined Authority’s contribution of £2.604 million is given from the Getting Building Fund.

(c)        The Combined Authority enters into a funding agreement with Leeds City Council for expenditure of up to £2.604 million from the Getting Building Fund.

(d)         Future approvals are made in accordance with the assurance pathway and approval route outlined in this report subject to the scheme remaining within the tolerances outlined in this report.  

(vii)         In respect of the Wakefield Business Gigabit Voucher Scheme the Investment Committee approved that:

(a)        The Wakefield Business Gigabit Voucher Scheme proceeds through decision point 5 (full business case with finalised costs) and work commences on activity 6 (delivery).

(b)        Approval to the Combined Authority’s contribution of £0.300 million from the Getting Building Fund. The total scheme value is £0.300 million.

(c)        The Combined Authority enters into a funding agreement with Wakefield Council for expenditure of up to £0.300 million from the Getting Building Fund.

(d)        Future approvals are made in accordance with the assurance pathway and approval route outlined in this subject to the scheme remaining within the tolerances outlined in this report.

(viii)        In respect of Mytholmroyd Flood Alleviation the Investment Committee recommends to the Combined Authority that:

(a)        The change request to the Mytholmroyd Flood Alleviation scheme to award an additional £2.000 million from the Local Growth Fund, taking the total Combined Authority Local Growth Fund contribution to £4.500 million, is approved.

(b)        The Combined Authority enters into a variation to the existing funding agreement with the Environment Agency, for additional expenditure of up to £2.000 million from the Local Growth Fund taking the full allocation of Combined Authority funding to £4.500 million.

(c)        Future approvals are made in accordance with the assurance pathway and approval route outlined in this report subject to the scheme remaining within the tolerances outlined in this report.

 

Minutes:

 

The Committee considered a report which set out proposals for the progression of, and funding for, a number of West Yorkshire Combined Authority supported projects, including West Yorkshire plus Transport Fund (Transport Fund) and Local Growth Fund, for consideration by the Investment Committee at stages 1, 2 and 3 of the Combined Authority’s assurance process. Members discussed the proposals for the progression of the following schemes which were detailed in the submitted report:

·     Project 7 – SIIF 012 – Advanced Manufacturing Company

·     LTP: Transforming Travel Centres

·     A58 Corridor Scheme

·     LTB ITB Rail Accessibility Package

·     Wakefield Warm Homes

·     Holbeck Phase 2 Victorian Terrace Retrofit

·     Wakefield Business Gigabit Voucher Scheme

·     Mytholmroyd Flood Alleviation

·    The Regent Street Bridge Scheme was withdrawn

The Committee was also advised of the following decisions made through delegations to the Combined Authority’s Managing Director since the last meeting:

·       A6110 / Leeds City Centre Package

Resolved:

(i)              In respect of the Project 7 – SIIF 012 – Advanced Manufacturing Company the Investment Committee recommended to the Combined Authority that they delegate authority to the Combined Authority’s Managing Director to approve, subject to the successful appraisal of the application by the Business Investment Panel (BIP) and Programme Appraisal Team (PAT).

(a)        The applicant’s full business case with finalised costs (decision point 5) and that work commences on activity 6 (delivery),

(b)        Approval for the Combined Authority’s contribution of £0.779 million is given from the Local Growth Fund.

(c)        The scheme’s Assurance Framework pathway and approvals.

(ii)             In respect of LTP: Transforming Travel Centres the Investment Committee approved:

(a)         That the Transforming Travel Centres scheme proceeds through decision point 2 (strategic outline case) and work commences on activity 5 (full business case with finalised costs).

(b)         That an indicative approval to the total project value of £1.000 million is given from the Local Transport Plan Integrated Transport Block Fund, with full approval to spend being granted once the scheme has progressed through the assurance process to decision point 5 (full business case with finalised costs). 

(c)        That development costs of £0.169 million are approved to progress the scheme to decision point 5 (full business case with finalised costs), taking the total approval to £0.270 million, from the Local Transport Plan Integrated Transport Block Fund. 

(d)         Future approvals are made in accordance with the assurance pathway and approval route outlined in this report subject to the scheme remaining within the tolerances outlined in this report.

(iii)           In respect of the A58 Corridor (Leeds) the Investment Committee recommended to the Combined Authority that:

(a)        The A58 Corridor scheme proceeds through decision point 3 (outline business case) and work commences on activity 4 (full business case).

(b)        That an indicative approval to the total project value of £9.530 millionis granted from the West Yorkshire plus Transport Fund, with full approval to spend being granted once the scheme has progressed through the assurance process to decision point 5 (full business case with finalised costs).

(c)        Development costs of £1.259 million from the West Yorkshire plus Transport Fund are approved to cover costs to date to progress the scheme to outline business case and in order to progress the scheme to decision point 4 (full business case with finalised costs) and 5 (full business case with finalised costs).

(d)        The Combined Authority enters into a funding agreement with Leeds City Council for up to £1.259 from the West Yorkshire plus Transport Fund.

(e)        Future approvals are made in accordance with the assurance pathway and approval route outlined in this report subject to the scheme remaining within the tolerances outlined in this report.

(iv)           In respect of the LTP ITB Rail Accessibility Package the Investment Committee approved that:

(a)        The LTP ITB Rail Accessibility Package proceeds through decision point 5 (full business case with finalised costs) and work commences on activity 6 (delivery).

(b)        Approval to £708,750 from the Local Transport Plan Integrated Transport Block 2019-22 is given. The total scheme value is £7.044 million.

(c)        The Combined Authority to enter into a grant funding agreement with Northern for expenditure of up to £176,250 from the LTP ITB 2019-22 fund, towards the Todmorden business case development and delivery costs.

(d)        The Combined Authority to enter into a funding agreement with Network Rail for expenditure of up to £0.180 million from the LTP ITB 2019-22 fund, towards the Menston business case development and delivery costs.

(e)        The Combined Authority to enter into a grant funding agreement with Northern for expenditure of up to £352,500 from the LTP ITB 2019-22 fund, towards the Pontefract Monkhill business case development and delivery costs.

(f)          Future approvals are made in accordance with the assurance pathway and approval route outlined in this report, subject to the package remaining within the tolerances outlined in this report.

(v)            In respect of Wakefield Warm Homes the Investment Committee approved that:

(a)        The Wakefield Warm Homes scheme proceeds through decision point 5 (full business case with finalised costs) and work comments on activity 6 (delivery)

(b)        Approval to £0.661 million from the Getting Building Fund is given. The total scheme value is £0.961 million.

(c)        The Combined Authority to enter into a funding agreement with Wakefield Council for expenditure of up to £0.661 million from the Getting Building Fund.

(d)        Future approvals are made in accordance with the assurance pathway and approval route outlined in this report subject to the scheme remaining within the tolerances outlined in this report.

(vi)           In respect of the Holbeck Phase 2 Victorian Terrace Retrofit the Investment Committee approves that:  

(a)        The GBF Holbeck Phase 2 scheme proceeds through decision point 5 (full business case with finalised costs) and work commences on activity 6 (delivery).  

(b)        Approval for the Combined Authority’s contribution of £2.604 million is given from the Getting Building Fund.

(c)        The Combined Authority enters into a funding agreement with Leeds City Council for expenditure of up to £2.604 million from the Getting Building Fund.

(d)         Future approvals are made in accordance with the assurance pathway and approval route outlined in this report subject to the scheme remaining within the tolerances outlined in this report.  

(vii)         In respect of the Wakefield Business Gigabit Voucher Scheme the Investment Committee approved that:

(a)        The Wakefield Business Gigabit Voucher Scheme proceeds through decision point 5 (full business case with finalised costs) and work commences on activity 6 (delivery).

(b)        Approval to the Combined Authority’s contribution of £0.300 million from the Getting Building Fund. The total scheme value is £0.300 million.

(c)        The Combined Authority enters into a funding agreement with Wakefield Council for expenditure of up to £0.300 million from the Getting Building Fund.

(d)        Future approvals are made in accordance with the assurance pathway and approval route outlined in this subject to the scheme remaining within the tolerances outlined in this report.

(viii)        In respect of Mytholmroyd Flood Alleviation the Investment Committee recommends to the Combined Authority that:

(a)        The change request to the Mytholmroyd Flood Alleviation scheme to award an additional £2.000 million from the Local Growth Fund, taking the total Combined Authority Local Growth Fund contribution to £4.500 million, is approved.

(b)        The Combined Authority enters into a variation to the existing funding agreement with the Environment Agency, for additional expenditure of up to £2.000 million from the Local Growth Fund taking the full allocation of Combined Authority funding to £4.500 million.

(c)        Future approvals are made in accordance with the assurance pathway and approval route outlined in this report subject to the scheme remaining within the tolerances outlined in this report.

 